📊 Project Baseline Analytics Dashboard
Analytical project parameters computed via direct Critical Path algorithms.
Cumulative Project Cost Weight (S-Curve)
Manpower Distribution Weights (Man-Hours Histogram)
Machinery Load Distributions (Machine-Hours Histogram)
🔴 Controlling Path Operations (Total Float = 0)
👤 Cloud Storage Portal
Log in to verify your structural project arrays with the cloud backup directory.
🚀 Workbench Guide (/5)
CPM ENGINE1. Establish Project Identity
Configure your unique workspace fingerprint in the top row. Updating the Project ID Prefix automatically updates all down-funnel operational WBS prefixes and scheduling hooks synchronously.
2. Baseline Calendar Controls
Select a valid contract Start Date. The system will unlock the workspace tools, inject fixed structural WBS sequences, and set the **Notice to Proceed (NTP)** milestone anchor point automatically.
3. Predecessors Logic Matrix
Select an activity row and click Edit Parameters. Assign sequence links (FS, SS, FF) with precise lead/lag offsets. The engine intercepts network dependencies to prevent infinite logic loops.
4. Resource Loads & BOQ Reference
Inside the parameter panel, allocate budgeted costs (USD), target man-hours, and equipment profiles. Bind line tasks to contract payment numbers via the Bill of Quantities (BOQ) tool.
5. Double-Pass CPM Analytics
Click Run CPM Analytics to process early/late dates. Any path with Total Float = 0 triggers a critical path trace, highlighting tasks in red. Toggle between linear or cubic smooth curves on your full-page S-curve graphs.